Bob, Skeleton and Luge Track for

Olympic Winter Games
Nagano / 1998 / Japan

1993 - 1995

Feasibility Study
Preliminary Design Phase
Final Design Phase


Track Design

  • Design of centerline including all start locations
  • Calculation of speeds and g-forces for different disciplines and for all start locations
  • Design of profile geometry
  • Run dynamic calculations, analysis of trajectories
  • Documentation for International Federations IBSF and FIL

Construction Design for the track body and safety system

  • Description for the technology of fabrication
  • Preliminary Design of crash barrier and rollover protection

Assistant Construction Supervision

  • Construction supervision during the whole construction phase for all elements related to the track
  • Site inspections together with International Federations during construction phase