2006 - 2007
Feasibility Study for the bid process
2009
2009
2010
2010 - 2012
Masterplan Design1
- Site master planning and layout for the entire venue
- Layout and planning of
– all onsite access roads
– all onsite pedestrian trails, spectator access and seating areas - Designated access routes for spectators, athletes, officials, VIPs, media, emergency personnel and operation stuff
- Venue traffic management
Track Design
- Design of centerline including all start location
- Calculation of speeds and g-forces for different disciplines and for all start locations
- Design of profile geometry
- Run dynamic calculations, analysis of trajectories
- Documentation for International Federations IBSF and FIL
Refrigeration Design2
- Choice of Refrigerant, selection of Compression System
- Design and Configuration of the Refrigerating System
- Design and Configuration of the Refrigerating Plant
- Cost estimation of investment, energy and maintenance costs
- Maintenance and Operating Specifications
Construction Design for the track body and safety system
- Description for the technology of fabrication
- Structural analysis for the track, formwork and reinforcement drawings
- Design of crash barrier and rollover protection
Construction Supervision
- Check of construction drawings of local contractors
- Construction supervision during the whole construction phase for all elements related to the track
- Measurement control
- Site inspections together with International Federations during construction phase
1 Contractor Master Plan design Planimetrix Whistler, Canada
2 Sub-contractor for refrigeration design Planungsbüro Deyle Stuttgart, Germany