Bob, Skeleton and Luge Track for

Olympic Winter Games
Torino / 2006 / Italy

2002

Feasibility Study

2002

Preliminary Design Phase

2002

Final Design Phase

2003

Working Design Phase


Track Design

  • Design of centerline including all start locations
  • Calculation of speeds and g-forces for different disciplines and for all start locations
  • Design of profile geometry
  • Run dynamic calculations, analysis of trajectories
  • Documentation for International Federations IBSF and FIL

Construction Design for the track body and safety system

  • Description for the technology of fabrication
  • Structural analysis for the track and all buildings, bridges, underpasses including foundation
  • formwork and reinforcement drawings for the track and all buildings, bridges, underpasses including foundation
  • Design of crash barrier and rollover protection

Construction Supervision

  • Construction supervision during the whole construction phase for all elements related to the track
  • Site inspections together with International Federations during construction phase

Architecture and Refrigeration Design1

1 Planungsbüro Deyle Stuttgart, Germany