Bob, Skeleton and Luge Track for

Olympic Winter Games
Vancouver / 2010 / Canada

2004 - 2005

Preliminary Design Phase

2005 - 2006

Final Design Phase


Track Design

  • Design of centerline including all start locations
  • Calculation of speeds and g-forces for different disciplines and for all start locations
  • Design of profile geometry
  • Run dynamic calculations, analysis of trajectories
  • Documentation for International Federations IBSF and FIL

Assistant Construction Supervision

  • Check of construction drawings of local contractors
  • Site inspections together with International Federations during construction phase